顶承静压桩托换施工技术 |
点此下载全文 |
引用本文:刘海刚.顶承静压桩托换施工技术[J].钻探工程,1998,(6):13-15.. Top Supported Jack up Pile Underpinning Construction Techniques[J]. Drilling Engineering, 1998,(6):13-15. |
摘要点击次数: 955 |
全文下载次数: 368 |
刘海刚 |
首钢勘察研究总院 |
|
中文摘要:通过某钢厂的应用实例,介绍了顶承静压桩基础托换施工的设计及工艺方法,并进行沉降对比分析。 |
中文关键词:基础托换,静压桩,顶承,沉降 |
|
Top Supported Jack up Pile Underpinning Construction Techniques |
Liu Haigang |
|
|
Abstract:This paper introduces in detail the design and techniques of top supported jack up pile underpinning construction through an application case in a steel plant, and comparative analysis of subsidence is carried out. |
keywords:underpinning, jack up pile, top support, subsidence, |
查看全文 查看/发表评论 下载PDF阅读器 |
|
|
|