长沙现代大厦复合土钉墙基坑支护方案设计
投稿时间:2004-03-26    点此下载全文
引用本文:高林渊,张喜文.长沙现代大厦复合土钉墙基坑支护方案设计[J].钻探工程,2004,31(8):15-18,22.
GAO Lin-yuan,ZHANG Xi-wen. Project Design of Combined Soil Nail Supporting to Foundation Pits of Changsha Modern Mansion[J]. Drilling Engineering, 2004,31(8):15-18,22.
摘要点击次数: 1013
全文下载次数: 382
作者单位E-mail
高林渊 华冠实业总公司 gaolinyuan@sina100.com 
张喜文 华冠实业总公司  
中文摘要:分析了长沙现代大厦基坑的岩土工程条件及周边环境条件,在此基础上对几种基坑支护方案进行了分析论证,并对所采用的复合土钉墙支护方案进行了设计计算。
中文关键词:基坑支护  桩锚  土钉  复合土钉墙
 
Project Design of Combined Soil Nail Supporting to Foundation Pits of Changsha Modern Mansion
Abstract:The rock and soil conditions of and circumstances around the foundation pits of Changsha Moern Mansion were analyzed. Further several foundation pit supporting plans were analyzed and approached. Finally the adopted combined soil nail wall supporting plan was calculated and designed.
keywords:foundation pit supporting  pile anchor  soil nail  combined soil nail wall