北京地铁光华路站风道暗挖工程监控量测技术 |
投稿时间:2005-03-18 修订日期:2005-03-18 点此下载全文 |
引用本文:李永宽,崔江余,李永平.北京地铁光华路站风道暗挖工程监控量测技术[J].钻探工程,2005,32(9):59-61.LI Yong-kuan,CUI Jiang-yu,LI Yong-ping. Monitoring Measurement Technology on Duct Shallow Tunneling Engineering of Metro at Guanghualu Station in Beijing[J]. Drilling Engineering, 2005,32(9):59-61. |
摘要点击次数: 815 |
全文下载次数: 295 |
|
|
中文摘要:结合北京地铁光华路站西北风道工程施工中应用的监控量测系统技术,介绍城市地铁工程施工中如何通过监测地表沉降、拱顶沉降等来控制和指导施工。 |
中文关键词:地铁风道 暗挖 监控量测 沉降 |
|
Monitoring Measurement Technology on Duct Shallow Tunneling Engineering of Metro at Guanghualu Station in Beijing |
|
|
Abstract:Combining monitoring measurement system technology using at west-northern duct Guanghualu station in metro of Beijing, how to control and instruct construction through monitoring surface settlement and arch crown settlement was introduced in the metro construction. |
keywords:ventilation passage of metro tunneling monitoring measurement settlement |