中文摘要:北京市深基坑工程中土钉墙支护技术应用比较广泛,对于边坡变形要求严格的基坑,采用土钉墙与预应力锚杆联合支护技术可有效控制变形,结合工程实例,介绍了该技术的设计思路及应用过程,说明了该技术的适用性,并就施工中遇到的问题进行分析,给出相应的处理措施。
中文关键词:土钉墙  预应力锚杆  深基坑支护
 
Composite Support Technique for Soil nailing Wall and Pre stressed Anchor
Abstract:The technique of soil nailing wall is widely applied in Beijing, and the composite support technique for soil-nailing wall and pre-stressed anchor can efficiently control the deformation. The design way and the applicability of this technique is illustrated with a field case, and analysis on some problems encountered during construction are made with the corresponding measures.
keywords:soil-nailing wall  pre-stressed anchor  deep foundation pit