武汉政和王府花园深基坑支护设计与施工
  修订日期:2007-03-12  点此下载全文
引用本文:黄晓琴,陈飞.武汉政和王府花园深基坑支护设计与施工[J].钻探工程,2007,34(6):17-20.
. Design and Construction of Deep Foundation Pit Retaining for Wuhan Zhenghewangfu Garden[J]. Drilling Engineering, 2007,34(6):17-20.
摘要点击次数: 1020
全文下载次数: 986
黄晓琴  陈飞
[1]江西省地质工程(集团)
公司,江西南昌330029 [2]中国地质大学(武汉)
工程学院,湖北武汉430074
中文摘要:针对武汉政和王府花园深基坑极为复杂的地质条件和周边环境,采用桩锚支护、粉喷桩桩侧止水、井点降水的联合支护方案施工,保证了基坑施工和周边建筑物及地下管线的安全,降低了工程成本,缩短了工期,取得了很好的经济效益和社会效益。
中文关键词:复杂地质条件 深基坑支护 桩锚支护 粉喷桩 井点降水
 
Design and Construction of Deep Foundation Pit Retaining for Wuhan Zhenghewangfu Garden
HUANG Xiao-qin  CHEN Fei
1. Jiangxi Geoengineering Group Corporation, Nanehang Jiangxi 330029, China; 2. Engineering Faeuty, China University of Geoseiences, Wuhan Hubei 430074, China
Abstract:Because of complicated geological conditions and neighboring environment in the site of foundation pit of Wuhan Zhenghewangfu Garden, combined supporting method was adopted with pile anchor retaining, shaft sealing with dry jet mixed pile and well point dewatering, so safety was ensured for construction of deep foundation pit, surrounding buildings and underground utilities. Economic and social benefits were achieved with lower cost and shorter construction period.
keywords:complicated geological condition  deep foundation pit retaining  pile anchor retaining  dry jet mixed pile  well point dewatering
查看全文  查看/发表评论  下载PDF阅读器