锦屏一级电站尾水调压室大角度上仰孔锚索施工
投稿时间:2008-07-14    点此下载全文
引用本文:黄辉.锦屏一级电站尾水调压室大角度上仰孔锚索施工[J].钻探工程,2009,36(2):55-58.
HUANG Hui. Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station[J]. Drilling Engineering, 2009,36(2):55-58.
摘要点击次数: 1311
全文下载次数: 826
作者单位E-mail
黄辉 四川准达岩土工程有限责任公司 huanghuicdut@126.com 
中文摘要:锦屏一级水电站地下厂房尾水调压室顶拱发育有f14、f18断层及煌斑岩脉,开挖后出露断层及其影响带岩体破碎,风化强烈,围岩不稳定,为了洞室稳定及施工安全,设计采用预应力锚索进行加强支护。介绍了尾水调压室大角度上仰孔锚索的施工方法。
中文关键词:大角度上仰孔  预应力锚索  施工方法  尾水调压室  锦屏一级电站
 
Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station
Abstract:f14, f18 fault and lamprophyre veins are developed in the top arch of tailrace surge tank in underground powerhouse of Jinping I hydropower station, the fault and the influence line was exposed after excavation with broken rock, strong weathering and instable surrounding rock. Pre-stressed anchor cable was designed to strengthen the support for cavity stability and construction safety. The papermainly introduced the construction method for anchor cable with large-angle upward hole in tailrace surge tank.
keywords:large-angle upward hole  pre-stressed anchor cable  construction method  tailrace surge tank  JinpingI hydropower station