深圳地铁隧道区间盾构施工与配套机械配置分析 |
投稿时间:2009-10-30 修订日期:2009-10-30 点此下载全文 |
引用本文:李伟,黄琦恒.深圳地铁隧道区间盾构施工与配套机械配置分析[J].钻探工程,2010,37(5):78-81,72.LI Wei,HUANG Qi-heng. Analysis on Allocation of Tunnel Interval Shield Construction and Auxiliary Machinery[J]. Drilling Engineering, 2010,37(5):78-81,72. |
摘要点击次数: 1028 |
全文下载次数: 958 |
|
|
中文摘要:通过对深圳地铁五号线5304标民~五隧道区间盾构施工方法与机械配置分析,总结了实现地铁隧道盾构区间快速施工盾构配套设备选型,为类似城市地铁工程施工积累经验。 |
中文关键词:地铁 隧道盾构施工 配套机械 选型分析 |
|
Analysis on Allocation of Tunnel Interval Shield Construction and Auxiliary Machinery |
|
|
Abstract:By the analysis on the shield construction method and machinery allocation for Minzhi to Wuhe tunnel interval of Shenzhen metro No.5 Line, subway tunnel shield supporting equipment selection for subway tunnel shield interval rapid construction was summed up to accumulate experience the similar project. |
keywords:metro tunneling shield construction auxiliary machinery selection analysis |