长白沿江矿区勘查ZK0902孔施工技术
投稿时间:2009-12-17  修订日期:2009-12-17  点此下载全文
引用本文:全志刚,王禹,杨春柳.长白沿江矿区勘查ZK0902孔施工技术[J].钻探工程,2010,37(4):34-36.
QUAN Zhi-gang,WANG Yu,YANG Chun-liu. Construction Technology of ZK0902 Exploration Hole in Yanjiang Mine of Changbai in Jilin[J]. Drilling Engineering, 2010,37(4):34-36.
摘要点击次数: 1263
全文下载次数: 913
作者单位E-mail
全志刚 吉林省地矿局第六地质探矿工程大队 ltddgcb@163.com 
王禹* 吉林省地矿局第六地质探矿工程大队 ltddgcb@163.com 
杨春柳 吉林省地矿局第六地质探矿工程大队  
中文摘要:长白沿江矿区钻探施工中遇到的主要问题是煤系地层水化膨胀,形成陷塘,钻孔坍塌、掉块,深部灰岩蚀变,形成溶洞,严重漏失,导致施工周期延长,现场及时分析原因,采用针对性的工艺措施,成功地解决了上述问题,圆满地完成了矿区施工任务。
中文关键词:煤系地层  绳索取心钻探  陷塘
 
Construction Technology of ZK0902 Exploration Hole in Yanjiang Mine of Changbai in Jilin
Abstract:Hydration swelling in coal measure strata with subsidence pool forming was the main difficulty in drilling construction in Yanjiang mine of Changbai; and hole collapsing, block-falling and deep limestone alteration formed karst cave with serious leakage and long construction period. Field analysis was made to solve the above problems by specific technologies.
keywords:coal measure strata  wire-line drilling  subsidence pool