中文摘要:长白沿江矿区钻探施工中遇到的主要问题是煤系地层水化膨胀,形成陷塘,钻孔坍塌、掉块,深部灰岩蚀变,形成溶洞,严重漏失,导致施工周期延长,现场及时分析原因,采用针对性的工艺措施,成功地解决了上述问题,圆满地完成了矿区施工任务。 |
中文关键词:煤系地层 绳索取心钻探 陷塘 |
|
Construction Technology of ZK0902 Exploration Hole in Yanjiang Mine of Changbai in Jilin |
|
|
Abstract:Hydration swelling in coal measure strata with subsidence pool forming was the main difficulty in drilling construction in Yanjiang mine of Changbai; and hole collapsing, block-falling and deep limestone alteration formed karst cave with serious leakage and long construction period. Field analysis was made to solve the above problems by specific technologies. |
keywords:coal measure strata wire-line drilling subsidence pool |