机械钻井法施工矿山竖井预制井壁漂浮法安放工艺技术
投稿时间:2010-02-11  修订日期:2010-02-11  点此下载全文
引用本文:杨宗仁,戚树军,王华明,等.机械钻井法施工矿山竖井预制井壁漂浮法安放工艺技术[J].钻探工程,2010,37(7):63-65,73.
YANG Zong-ren,QI Shu-jun,WANG Hua-ming,et al. Floating Installation Technology for Prefabricated Shaft Wall in Vertical Shaft of Mine Constructed by Mechanical Drilling[J]. Drilling Engineering, 2010,37(7):63-65,73.
摘要点击次数: 1079
全文下载次数: 884
作者单位E-mail
杨宗仁* 河北大直径工程井建设有限公司 hbjkyzr@sina.com 
戚树军 河北省地矿局第二地质大队  
王华明 河北大直径工程井建设有限公司  
胡立宾 河北大直径工程井建设有限公司  
中文摘要:结合河北遵化铁矿Φ5.6 m、深286 m矿山竖井工程,介绍了钻井法施工矿山竖井采用漂浮法安放预制井壁的工艺原理,以及相邻两节井壁连接时的测量方法、工艺控制和井壁安放完成后井筒垂直度的测量技术等。
中文关键词:矿山竖井  钻井法  井壁  漂浮法安放
 
Floating Installation Technology for Prefabricated Shaft Wall in Vertical Shaft of Mine Constructed by Mechanical Drilling
Abstract:Based on the engineering of vertical shaft of Zunhua iron mine in Hebei, which was 5.6 m in diameter and 286 m in depth, the paper introduced technological principles of vertical shaft constructed by drilling method and prefabricated shaft wall installed by floating installation technology, together with measuring method for the adjacent two shaft walls connection, process control and vertical measuring technology of the shaft after its wall installation.
keywords:vertical shaft of mine  drilling method  shaft wall  floating installation