中文摘要:通过对大同市某变电站下伏采空区治理的实例,介绍了采空区治理方法的选择和实施过程,探讨了采空区注浆加固治理工程设计理念,总结了施工过程中各种问题的解决方法和成功经验。
中文关键词:采空区  治理方法  注浆加固
 
Grouting Reinforcement for Mined-out Area Underlying Substation in Datong
Abstract:Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.
keywords:mined-out area  treatment method  grouting reiforcement