    The dam foundation of Lujichang hydropower station was built on overburden formation with interlayer of sand gravel, block stone and shaly fine sand formation, the bearing capacity of natural foundation could not satisfy the design requirement; 180 kW high power electric vibroflotation device and drilling rig were applied to solve the construction difficulties in complex formation and deep vibroflotation consolidation.