The main way of geo-engineeringdriling used in subsidence control,and reinjection wellconstruction techniques are introduced combining withthe effective situation of ground subsidence control inTianjin.
参考文献
相似文献
引证文献
引用本文
黄自培.天津市控沉钻探现状[J].钻探工程,1994,(2):30-32.Huang Zipei. Status of Subsidence Control Drilling in Tianjin[J]. Drilling Engineering, 1994,(2):30-32.