振动沉管灌注桩施工工艺
    点此下载全文
引用本文:胡中立.振动沉管灌注桩施工工艺[J].钻探工程,1994,(4):22-24,29.
. Construction Process of Vibro-Tube Sinking[J]. Drilling Engineering, 1994,(4):22-24,29.
摘要点击次数: 1083
全文下载次数: 361
胡中立
河南省岩土工程公司第二工程处
中文摘要:介绍了振动沉管灌注桩施工复杂地层的工艺,提高单桩承动力和成孔成桩效率的措施。讨论了取土器取土(砂)问题。评价了振动沉管灌注桩的应用前景。
中文关键词:振动沉管灌注桩,取土器,单桩承载力,成孔成桩效率
 
Construction Process of Vibro-Tube Sinking
Hu Zhongli
Abstract:Described are prooess of Vibro-tube sinking bored piles constructed in comples formations,and mea-sures of incaing single pile bearing capacity and bole completion & pile completion efficisncy, Problem ofVibro tube sinking bored piles is evaluated.
keywords:Vibro- tube sinking bored pile, soil sampler, single pile bearing capacity, hole completion &pile completion efficiency.,
查看全文  查看/发表评论  下载PDF阅读器