During testing construction of high pressure jet grouting for reinforcing ebb gate foundation of Ji canal, through high pressure jet grouting around the defective grouting pile of ebb gate foundation, high strength complex pile shaft was formed. The method was also used for constructing the seepage proof wall on upper and lower parts of the floor of ebb gate. The void filling grouting under the gate floor guaranteed seepage proof stability and sliding resisting stability of flood gate foundation.
参考文献
相似文献
引证文献
引用本文
刘才高 黄灿新.蓟运河防潮闸基础加固高压喷射试验施工[J].钻探工程,1999,(5):24-26.Liu Caigao, Huang Canxin. Testing Construction of High Pressure Jet Grouting for Reinforcing Ebb Gate Foundation of Ji Canal[J]. Drilling Engineering, 1999,(5):24-26.