The utilization program of landslide mass is researched on the basis of landslide controlling engineering taking the resettlement site of Xiakou, Hubei as an example. Two rows of anti-sliding pile are distributing at the 180 m and 230 m altitude to effectively control the complete landslide, also provide the platform for highway and house construction. A lot of drilling piles with small diameter are installed depended on the house basement that provide well bear capacity, and can also resist sliding. Four platforms are constructed combined with landslide control, that solve the safety problem for developing land on the landslide mass.