The mechanism of increase of the bore pile bearing capacity by post grouting has been further understood through analysis of the testing results of bored piles with post grouting in Shanghai. Some suggestions on how to use the post grouting technique properly is put forward.
参考文献
相似文献
引证文献
引用本文
吴礼生,徐卫红,王爱平.钻孔灌注桩后压浆技术机理的新认识[J].钻探工程,2001,(5):4-6.WU Li sheng, WANG Ai ping. New Understanding on the Mechanism of Post Grout Injection for Bored Piles[J]. Drilling Engineering, 2001,(5):4-6.