The drilling principle, down-the-hole hammer drilling technique, core dynamite technology about accumulating capacity and cutting rock technology about tubular drill are introduced, taking bored pile construction of light track inclined bridge engineering in Changchun as a sample. Efficient methods of drilling hole and making pile for the large floating rock have been sum up.
参考文献
相似文献
引证文献
引用本文
吴开滨,代国忠.长春市轻轨工程大漂石地层灌注桩成孔钻进技术[J].钻探工程,2004,31(12):12-13.WU Kai-bin, DAI Guo-zhong. The Applications of Bored Pile Drilling Tech. in Large Floating Rock in Changchun Light Rail Project[J]. Drilling Engineering, 2004,31(12):12-13.