郑东新区地下管道顶管施工中常遇到的几个问题 |
投稿时间:2004-06-09 点此下载全文 |
引用本文:王刚,赵建粮,赵目军.郑东新区地下管道顶管施工中常遇到的几个问题[J].钻探工程,2004,31(12):21-22,29.WANG Gang,ZHAO Jian-liang,ZHAO Mu-jun. Frequent Encounter Problems in Underground Pipeline Thrusting[J]. Drilling Engineering, 2004,31(12):21-22,29. |
摘要点击次数: 836 |
全文下载次数: 341 |
|
|
中文摘要:介绍了在郑州市郑东新区顶管施工中常遇到的几个问题,包括降水施工、工作坑的支护、顶进时的坍塌、顶进时的偏差、顶进时引起的地面沉降等,分析了原因,提供了解决问题的思路。 |
中文关键词:郑州市郑东新区 地下管线铺设 顶管施工 |
|
Frequent Encounter Problems in Underground Pipeline Thrusting |
|
|
Abstract:Several problems frequent encountered during underground pipeline thrusting in new distriction of east Zhenzhou, including water level lowing, pit supporting, cave-in during thrusting, deviation, surface settlement and so on, were introduced. The causes of the problems were analyzed. The concept of the problem settlement was put forward. |
keywords:New District Of East Zhenzhou underground pipeline layout pile thrusting |