Based on the in-situ investigation results for the storey-addition of Siping-Building, the engineering geological problems relate liquefaction of sandy soils and the settlements of an existed building caused by the storey-addition activities have been discussed. Results show that the long-time load of buildings is very useful for the increasing of both the strength of sub-soils and the anti-seism ability of sandy sub-soils.
参考文献
相似文献
引证文献
引用本文
肖鸿斌,叶为民,林宗庆.上海四平大楼加层的工程地质分析[J].钻探工程,2004,31(8):12-14.XIAO Hong-bin, YE Wei-min, LIN Zong-qing. Analysis on Engineering Geological Problems Related to Storey-addition of Siping-Building in Shanghai[J]. Drilling Engineering, 2004,31(8):12-14.