屿塘山东侧滑坡成因分析与治理措施
投稿时间:2004-10-21  修订日期:2004-10-21  点此下载全文
引用本文:骆嘉成,曹晓宇,强小兵.屿塘山东侧滑坡成因分析与治理措施[J].钻探工程,2005,32(3):36-38.
LUO Jia-cheng,CAO Xiao-yu,QIANG Xiao-bing. Causes Analyses on Landslide of East Side of Yutang Mountain and Control Measure against It[J]. Drilling Engineering, 2005,32(3):36-38.
摘要点击次数: 1042
全文下载次数: 294
作者单位E-mail
骆嘉成 温州浙南地质工程有限公司 luojiacheng@vip.sina.com 
曹晓宇 温州浙南建设监理有限公司 cxy5958@126.com 
强小兵 温州浙南地质工程有限公司  
中文摘要:详细分析了温州市永嘉县屿塘山东侧滑坡产生的原因,并列举各影响因素的作用机理。治理措施采用截排水沟与抗滑桩相结合,并介绍了施工中应注意的几个关键事项。
中文关键词:屿塘山滑坡  滑坡体  截排水沟  抗滑桩
 
Causes Analyses on Landslide of East Side of Yutang Mountain and Control Measure against It
Abstract:The causes of the landslide which occurred in east side of Yutang Mountain located in Yongjia County of Wenzhou City were analyzed in detail. Various elements which affect the landslide were listed. The measure of combined water drain with anti-slide piles was taken. Some key points which should be paid attention in construction were introduced.
keywords:Yutang Mountain landslide  landslide body  drain dyke  anti-slide piles
查看全文  查看/发表评论  下载PDF阅读器