北京朝阳广场深基坑支护技术
投稿时间:2006-08-11  修订日期:2006-08-11  点此下载全文
引用本文:刘兴旺,周葛源.北京朝阳广场深基坑支护技术[J].钻探工程,2006,33(10):8-13.
. Bracing of Deep Foundation Pit Applied in Chaoyang Square Construction Project[J]. Drilling Engineering, 2006,33(10):8-13.
摘要点击次数: 1056
全文下载次数: 934
刘兴旺  周葛源
[1]北京市机械施工有限公司,北京100045 [2]江西省地质矿产勘查开发局902探矿工程大队,江西新余338000
中文摘要:北京朝阳广场深基坑支护设计尝试采用上部复合土钉墙,下部桩加预应力锚杆的支护形式。上部复合土钉墙较桩锚支护节约成本。土钉墙设计中第三道土钉替换为预应力土钉,有效地限制了土钉墙顶部位移。土钉墙顶面及桩顶连梁上布置变形监测点,采用量距法及经纬仪挑直线的测量方法进行变形监测,实测变形的数据均在规范允许范围内。
中文关键词:深基坑支护 复合土钉墙 预应力锚杆 钢腰梁 护坡桩 支护结构设计 变形监测
 
Bracing of Deep Foundation Pit Applied in Chaoyang Square Construction Project
LIU Xing-wang  ZHOU Geyuan
Abstract:The article introduces the application of bracing of deep foundation pit in Chaoyang Square. The compound soil nailed wall and pre-stressed anchor rod was adopted for the upside and underside wall separately. Soil nailed wall was economical. And in the design, the third layer of soil nail wall was replaced with pre-stressed soil nail to effectively restrict the displacement of the top of soil nailed wall. Monitoring spot was laid on the top of soil nailed wall and the top of pile to measure distortion with theodolite, and all the data measured is in permitted scope of criterion.
keywords:bracing of deep foundation pit  compound soil nailed wall  pre-stressed anchor rod  steel beam  slope-shoringpile  shoring structure design  deformation monitoring