地基下沉倾斜危楼双向顶升纠偏实践
投稿时间:2006-06-30  修订日期:2006-06-30  点此下载全文
引用本文:陈国政,陈守平,陈守安.地基下沉倾斜危楼双向顶升纠偏实践[J].钻探工程,2007,34(2):4-9.
. Application of Two-direction Rectification of Deviation by Jack-up for Dangerous Inclining Building with Foundation Subsidence[J]. Drilling Engineering, 2007,34(2):4-9.
摘要点击次数: 1078
全文下载次数: 966
陈国政  陈守平  陈守安
中国有色金属工业西安勘察院基础托换工程公司,陕西西安710054
中文摘要:某3层砖混结构楼房,因地基下沉且不稳定导致向南东倾斜成为危房,经采用静压桩托换地基加固补强控制地基稳定后,进行双向顶升纠偏设计、施工与试验,通过成果分析治理是成功的。介绍了纠偏设计与施工技术。
中文关键词:危楼 静压桩托换 地基加固 顶升纠偏
 
Application of Two-direction Rectification of Deviation by Jack-up for Dangerous Inclining Building with Foundation Subsidence
CHEN Guo-zheng  CHEN Shou-ping  CHEN Shou-an
Abstract:Because of the ground subsidence, a 3-storeyed masonry-concrete building became dangerous with southeast inclination. Static pressure pile underpinning was used to reinforce the foundation. After consolidation, the design, construction and test of two-direction rectification by jack-up were made, and it was proved successful. The design and construction of rectification of deviation were introduced.
keywords:dangerous building  static pressure pile underpinning  ground reinforcement  rectification of deviation by jack-up
查看全文  查看/发表评论  下载PDF阅读器