预应力管桩在汕头地区施工中几个问题的探讨
投稿时间:2006-12-07  修订日期:2006-12-07  点此下载全文
引用本文:林志文.预应力管桩在汕头地区施工中几个问题的探讨[J].钻探工程,2007,34(2):13-15.
. Study on Application of Pre-stressed Tubular Pile in Shantou District[J]. Drilling Engineering, 2007,34(2):13-15.
摘要点击次数: 986
全文下载次数: 706
林志文
广东省地勘局722地质大队,广东汕头515021
中文摘要:通过对汕头地区预应力管桩历年来的施工实例资料分析,根据汕头地区工程地质条件的特点和实践经验,对预应力管桩的设计、施工提出几点探讨性意见。
中文关键词:汕头地区 预应力管桩 桩侧摩阻力 桩端阻力 极限承载力 贯入度 终压值
 
Study on Application of Pre-stressed Tubular Pile in Shantou District
LIN Zhi-wen
Abstract:Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.
keywords:Shantou district  pre-stressed tubular pile  skin friction of pile  pile end resistance  ultimate bearing capacity  penetration  stop pressing value
查看全文  查看/发表评论  下载PDF阅读器