CFG桩和碎石桩复合处理液化土层的设计与施工
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU472.3

基金项目:


Design and Construction of Combined Treatment with CFG Pile and Gravel Pile in Liquefying Formation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    采用CFG桩和碎石桩相结合的复合地基方法处理黄河冲积平原新近沉积液化粉土地层,CFG桩属刚性桩,主要提高地基承载力,碎石桩则主要消除粉土层液化问题,通过该工程设计及实践,该复合地基方法处理黄河冲积平原液化地层的方法是可行的。

    Abstract:

    Composite foundation with CFG pile and gravel pile is taken in recently deposited liquefying silt ground in Yellow River alluvial plain. CFG pile can increase the bearing capacity of foundation with its rigidity, and gravel pile can eliminate the liquidation of silt ground. This construction method is proved workable.

    参考文献
    相似文献
    引证文献
引用本文

孙小杰 吴兆军 毛洁 绳怀海. CFG桩和碎石桩复合处理液化土层的设计与施工[J].钻探工程,2007,34(4):3-5.
SUN Xiao-jie, WU Zhao-jun, MAO Jie, et al. Design and Construction of Combined Treatment with CFG Pile and Gravel Pile in Liquefying Formation[J]. Drilling Engineering, 2007,34(4):3-5.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-11-13
  • 最后修改日期:2006-11-13
  • 录用日期:
  • 在线发布日期:
  • 出版日期: