According to the requirement of theoretical study and engineering practice,the data of temperature,stress,surface deformation and soil layers displacement are surveyed in situ during the artificial ground freezing of a tunneling engineering in Shanghai,and the data are analyzed and the regularity is studied.At last,several opinions and conclusion are given.
参考文献
相似文献
引证文献
引用本文
程知言,邓玲,周建华.上海某隧道人工地层冻结工程现场实测研究[J].钻探工程,2007,34(8):67-69,72.CHENG Zhi-yan, DENG Ling, ZHOU Jian-hua. Site Survey of Artificial Ground Freezing in Tunneling Engineering in Shanghai[J]. Drilling Engineering, 2007,34(8):67-69,72.