The paper introduced process flow of secant pile construction with the case of No. 1 Nanjing Metro, water bucket and submerged pump were applied for dewatering.
参考文献
相似文献
引证文献
引用本文
张治纯,程淼德,何建明,等.咬合桩在含承压水地层施工中的应用[J].钻探工程,2008,35(9):45-47.ZHANG Zhi-chun, CHENG Miao-de, HE Jian-ming, et al. Application of Secant Pile in Formation with Confined Water[J]. Drilling Engineering, 2008,35(9):45-47.