Deep foundation pit of a building in Zhuhai City was constructed in the ground, which original geological element was denuded deficient hills and manual filled and leveled. The depth of the excavation was 10 m, 10 ground displacement observation points, 4 lateral horizontal displacement observation holes and 4 underground water level logging stations were set, construction was carried under monitoring.
参考文献
相似文献
引证文献
引用本文
侯海清.珠海某大厦深基坑支护工程监测实例[J].钻探工程,2008,35(11):59-61.HOU Hai-qing. Field Case of Engineering Supervision on Reinforcement for Deep Foundation Pit of a Building in Zhuhai City[J]. Drilling Engineering, 2008,35(11):59-61.