According to the characteristics of drilling operation in north Erdos, analysis was made on common existing PDC bit balling in field application with a set of feasible preventive measures.
参考文献
相似文献
引证文献
引用本文
高明亮.鄂北工区PDC钻头泥包特征分析及预防措施[J].钻探工程,2009,36(9):21-23,27.GAO Ming-liang. Analysis on PDC Bit Balling Characteristics in Erdos Work Area and the Preventive Measures[J]. Drilling Engineering, 2009,36(9):21-23,27.