In an existing bridge pier reinforcement engineering in Liuzhou City, verticle pre-stressed cables were constructed by drilling in bridge piers to increase safety factors. This engineering case provided reference to the design and construction of existing bridge pier reinforcement.
参考文献
相似文献
引证文献
引用本文
唐俊,李飞.竖向预应力锚索在旧桥墩加固利用中的应用[J].钻探工程,2010,37(2):62-63.TANG Jun, LI Fei. Application of Verticle Pre-stressed Cable in Existing Bridge Pier Reinfocement[J]. Drilling Engineering, 2010,37(2):62-63.