We have consturcted 5 coalbed methane wells(there are 4 parameter wells) in Sichuan. The parameters reflected the procession of reservoir condition for coalbed methane development and small network of production test in Sichuan. But there are still serious existing problems such as slow drilling process, difficult layer selection for setting test and hole deviation control, coal seam correlation and coal recovery not ideal as expected and coal reservoir pollution. Three spuds well structure, deviation control with drilling straight, research on large diameter wireline coring and reservoir protection were suggested by the condition analysis to promote the drilling technical guarantee for coalbed methane exploration and development in Sichuan.
参考文献
相似文献
引证文献
引用本文
尹中山,胡勋茂.四川煤层气井施工的问题与对策[J].钻探工程,2010,37(2):4-8.YIN Zhong-shan, HU Xun-mao. Problems and the Countermeasures of Coalbed Methane Well Construction in Sichuan[J]. Drilling Engineering, 2010,37(2):4-8.