The dam foundation of Lujichang hydropower station was built on overburden formation with interlayer of sand gravel, block stone and shaly fine sand formation, the bearing capacity of natural foundation could not satisfy the design requirement; 180 kW high power electric vibroflotation device and drilling rig were applied to solve the construction difficulties in complex formation and deep vibroflotation consolidation.
参考文献
相似文献
引证文献
引用本文
方成名,李全福,何凤.云南鲁基厂水电站坝基振冲试验与施工[J].钻探工程,2010,37(4):54-57.FANG Cheng-ming, LI Quan-fu, HE Feng. Vibroflotation Test and Construction of Dam Foundation of Lujichang Hydropower Station in Yunnan[J]. Drilling Engineering, 2010,37(4):54-57.