甘肃岷县某金矿钻探施工技术与管理 |
投稿时间:2010-02-08 修订日期:2010-03-16 点此下载全文 |
引用本文:张宝河.甘肃岷县某金矿钻探施工技术与管理[J].钻探工程,2010,37(4):44-47.ZHANG Bao-he. Drilling Construction Technology and the Management in a Gold Mine in Gansu[J]. Drilling Engineering, 2010,37(4):44-47. |
摘要点击次数: 1197 |
全文下载次数: 858 |
|
|
中文摘要:分析了复杂地层的成因,通过精心筹划、严密组织、技术攻关、研制冲洗液、有针对性地研制钻头、规范作业,解决了施工护壁难和取心难题,较好地提高了施工效率和钻孔施工质量。 |
中文关键词:复杂地层 钻探施工 效率 质量 组织与管理 |
|
Drilling Construction Technology and the Management in a Gold Mine in Gansu |
|
|
Abstract:The causes of complex strata formation were analyzed; difficulties in the wall protection and coring were solved by technical research, flushing fluid development and implement bit development, the construction efficiency and borehole construction quality were improved. |
keywords:complex strata drilling construction efficiency quality organization and management |
查看全文 查看/发表评论 下载PDF阅读器 |