液压抓斗造塑性砼防渗墙在梅铺水库除险加固中的应用
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Application of Plastic Concrete Cut-off Wall Made by Hydraulic Grab in Meipu Reservoir Reinforcement Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以郧县梅铺水库大坝除险加固工程为例,结合工程实际地质及塑性砼防渗墙设计情况,从施工程序、施工工艺、成墙施工难点及对策、塑性砼防渗墙施工过程及质量控制等方面,介绍了液压抓斗造塑性砼防渗墙在土坝加固中的应用。

    Abstract:

    Taking the example of Meipu reservoir reinforcement project of Yun Country and combining with the practical engineering geology and the design of plastic concrete cut-off wall, the paper introduced the application of plastic concrete cut-off wall made by hydraulic grab in reservoir reinforcement about construction programs, construction technology, construction difficulties and countermeasures, construction processes and the quality control.

    参考文献
    相似文献
    引证文献
引用本文

马健,丁晔,武营军.液压抓斗造塑性砼防渗墙在梅铺水库除险加固中的应用[J].钻探工程,2010,37(8):64-66,69.
MA Jian, DING Ye, WU Ying-jun. Application of Plastic Concrete Cut-off Wall Made by Hydraulic Grab in Meipu Reservoir Reinforcement Project[J]. Drilling Engineering, 2010,37(8):64-66,69.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-03-11
  • 最后修改日期:2010-07-05
  • 录用日期:2010-07-25
  • 在线发布日期: 2010-09-08
  • 出版日期: 2010-08-25