Percussive or bored pile construction is difficult in karst area with long project period, high cost and low efficiency because of various borehole accidents. Based on the practice of geological investigation, design, supervision, technical advisory and construction management, the paper summarized the causes and prevention methods of various borehole accidents and put forward the relevant suggestions.
参考文献
相似文献
引证文献
引用本文
周安全,周湘.岩溶地区冲(钻)孔桩施工常见事故防治及其对策[J].钻探工程,2010,37(11):48-54.ZHOU An-quan, ZHOU Xiang. Discussion on Common Accident Prevention for Percussive or Bored Pile in Karst Area and the Countermeasures[J]. Drilling Engineering, 2010,37(11):48-54.