向山硫铁矿尾矿库联合排渗施工技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU472.3+;TD745+.22

基金项目:


Construction Technology of Combined Seepage Draining in Tailings Reservoir of Xiangshan Pyrite Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过水平排渗钻孔、碎石桩及盲沟等联合排渗工艺在向山硫铁矿某尾矿库再利用工程中应用的成功经验,介绍水平排渗孔等工艺在尾矿库再利用工程中的施工过程以及该工艺在尾矿坝中应用的前景。

    Abstract:

    Based on the successful experience of the application of combined seepage draining technology with horizontal drainage hole, gravel pile and blind ditch in a tailings reservoir of Xiangshan pyrite mine, the paper introduced the construction process of horizontal drainage hole in tailings reservoir and the application prospect of this technology.

    参考文献
    相似文献
    引证文献
引用本文

阮茂盛,刘庆祥.向山硫铁矿尾矿库联合排渗施工技术[J].钻探工程,2011,38(3):71-73.
RUAN Mao-sheng, LIU Qing-xiang. Construction Technology of Combined Seepage Draining in Tailings Reservoir of Xiangshan Pyrite Mine[J]. Drilling Engineering, 2011,38(3):71-73.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-05-21
  • 最后修改日期:2011-01-03
  • 录用日期:2011-02-12
  • 在线发布日期: 2011-03-29
  • 出版日期: 2011-03-25
×
《钻探工程》期刊采编系统正在进行升级改版,部分功能正在逐步完善,在此期间给大家的使用带来不便,敬请谅解。