全漏失钻孔预送冲洗液时间的确定
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634

基金项目:

湖南省自然科学基金资助(07JJ6089)


Determination of Timing for Supply of Advance Flushing Fluid in Boreholes with Full Lost Circulation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在岩心钻探施工中,全漏钻孔的预送冲洗液时间问题往往困扰着机台施工人员,为此提出了预送冲洗液的两种计算方法。

    Abstract:

    In core drilling, drillers are often obsessed with when advance flushing fluid should be supplied in fully lost boreholes. Two methods about how to determine the supply time are put forward and compared with each other for drilling of lost boreholes.

    参考文献
    相似文献
    引证文献
引用本文

钱书伟,杨胜生,贾文敏,等.全漏失钻孔预送冲洗液时间的确定[J].钻探工程,2011,38(3):44-45.
QIAN Shu-wei, YANG Sheng-sheng, JIA Wen-min, et al. Determination of Timing for Supply of Advance Flushing Fluid in Boreholes with Full Lost Circulation[J]. Drilling Engineering, 2011,38(3):44-45.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-09-03
  • 最后修改日期:2010-09-03
  • 录用日期:2011-01-03
  • 在线发布日期: 2011-03-29
  • 出版日期: 2011-03-25