煤层气多分支水平井技术探讨 |
投稿时间:2010-11-19 修订日期:2011-05-09 点此下载全文 |
引用本文:刘志强,胡汉月,史兵言,等.煤层气多分支水平井技术探讨[J].钻探工程,2011,38(6):6-9.LIU Zhi-qiang,HU Han-yue,SHI Bing-yan,et al. Technology of CBM Multiple-lateral Horizontal Well[J]. Drilling Engineering, 2011,38(6):6-9. |
摘要点击次数: 1367 |
全文下载次数: 1571 |
|
|
中文摘要:煤层气多分支水平井是集钻井、完井及增产措施为一体的煤层改造技术,近年来在国内有较大发展。结合国内当前煤层气多分支水平井的发展状况,对其技术难点和关键技术进行讨论,并得出几点认识。 |
中文关键词:煤层气 多分支井 水平井 对接连通 开采技术 |
|
Technology of CBM Multiple-lateral Horizontal Well |
|
|
Abstract:CBM multiple-lateral horizontal well is a coalbed modification technique combined with well drilling, completion and stimulation, which has great development in China in the past years. According to the development situation of CBM multiple-lateral horizontal well in China, the paper discusses the technical difficulties and key technologies and presents some conclusions. |
keywords:CBM multiple-lateral well horizontal well butting and connecting recovery technology |
查看全文 查看/发表评论 下载PDF阅读器 |