静观ZK1号地热井的施工及开发利用计划 |
投稿时间:2010-09-10 点此下载全文 |
引用本文:任良治,田正权,邝光升,等.静观ZK1号地热井的施工及开发利用计划[J].钻探工程,2010,37(10):48-50.REN Liang-zhi,TIAN Zheng-quan,KUANG Guang-sheng,et al. Construction of Jingguan ZK1 Geothermal Well and Development & Utilization Plan[J]. Drilling Engineering, 2010,37(10):48-50. |
摘要点击次数: 1239 |
全文下载次数: 1045 |
|
|
中文摘要:介绍了静观ZK1号地热井施工概况和设备机具选择,简述了分层钻进措施:采用“三开两固”成井,各次钻具配套,泥浆性能指标,固井工艺措施及抽水试验方法。经测定其井口水温63.5 ℃,由于其井口自流量仅为421.9 m3/d,不便于下一步开发利用,拟定在距原井700 m处再施工一定向井,并提出了定向井的初步设计方案。 |
中文关键词:地热井 设备机具 固井 定向井 开发利用 |
|
Construction of Jingguan ZK1 Geothermal Well and Development & Utilization Plan |
|
|
Abstract:This paper introduces the machinery and equipment for geothermal well construction, and describes the stratification drilling measures: 3-section and 2-cementing for well completion, drilling tool matching, mud property, well cementing and pumping test. It was unfavorable for further development and utilization with wellhead water temperature of 63.5 ℃ and flowing yield only 421.9 m3/d. Another directional well was planed to construct 700 m away from the original well; and the design scheme was put forward. |
keywords:geothermal well machine equipment well cementing directional well development and utilization |
查看全文 查看/发表评论 下载PDF阅读器 |