曹妃甸地区基坑支护降水方案选择及设计建议
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.2

基金项目:


Selection and the Design Suggestion of Protecting and Dewatering for Foundation Excavation Scheme in Caofeidian
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    首钢京唐钢铁联合有限责任公司是一个在曹妃甸岛上吹填砂造地形成的场地上新建的大型现代化精品钢铁基地。分析了该建筑场地的地质环境情况和常用的基坑支护、降水方法,对该建筑场地上的建(构)筑物的基坑支护、降水设计及方案选择提出建议。

    Abstract:

    Shougang Jingtan Co. is a large modernization outstanding quality iron and steel base in Caofeidian Island, which was newly built on a ground developed by hydraulic fill sand. Analysis was made on the geological conditions and commonly used methods of foundation pit support and dewatering in construction site; and the suggestions were also put forward to the foundation pit support and dewatering design for the existing buildings in construction site as well as the scheme selection.

    参考文献
    相似文献
    引证文献
引用本文

刘来新.曹妃甸地区基坑支护降水方案选择及设计建议[J].钻探工程,2012,39(4):44-47.
LIU Lai-xin. Selection and the Design Suggestion of Protecting and Dewatering for Foundation Excavation Scheme in Caofeidian[J]. Drilling Engineering, 2012,39(4):44-47.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-08-18
  • 最后修改日期:
  • 录用日期:2011-12-14
  • 在线发布日期: 2012-04-24
  • 出版日期: 2012-04-25