钻孔灌注桩后注浆技术实践及其效果分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.1

基金项目:


Practice of Post-grouting Technology for Bored Pile and the Effect Analysis
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了郑州广发花园二期·格林融熙国际大厦钻孔灌注桩后注浆的施工工艺及单桩静载试验结果;并通过该工程钻孔灌注桩后注浆施工的经济效益分析,阐明了后压浆技术是提高钻孔灌注桩单桩承载力的一项有效措施,具有良好的技术经济效益。

    Abstract:

    The construction of post-grouting technology for bored pile in Zhengzhou is presented with the static loading test results of a single pile; and by the economic benefit analysis on the post-grouting for bored pile construction, it is elucidated that post-grouting technology is an effective measure to improve bearing capacity of single bored pile with good technical and economic benefits.

    参考文献
    相似文献
    引证文献
引用本文

潘宏雨,孙芳.钻孔灌注桩后注浆技术实践及其效果分析[J].钻探工程,2012,39(7):56-58.
PAN Hong-yu, SUN Fang. Practice of Post-grouting Technology for Bored Pile and the Effect Analysis[J]. Drilling Engineering, 2012,39(7):56-58.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-01-06
  • 最后修改日期:2012-04-18
  • 录用日期:2012-06-27
  • 在线发布日期: 2012-07-30
  • 出版日期: