The construction of post-grouting technology for bored pile in Zhengzhou is presented with the static loading test results of a single pile; and by the economic benefit analysis on the post-grouting for bored pile construction, it is elucidated that post-grouting technology is an effective measure to improve bearing capacity of single bored pile with good technical and economic benefits.
参考文献
相似文献
引证文献
引用本文
潘宏雨,孙芳.钻孔灌注桩后注浆技术实践及其效果分析[J].钻探工程,2012,39(7):56-58.PAN Hong-yu, SUN Fang. Practice of Post-grouting Technology for Bored Pile and the Effect Analysis[J]. Drilling Engineering, 2012,39(7):56-58.