The stratum is complicated in Dabaoshan molybdenum mine. Leakage, block falling, borehole collapsing and diameter shrinkage often occurred and coring was difficult for drilling tool breaking, sticking, bit burning and burying. By selection of rational drilling technologies, wall protection and leakage control methods and drilling coring methods, the detailed survey and prospecting drilling were smoothly completed. The paper introduced the drilling technology in the complex formation of Dabaoshan molybdenum mine.
参考文献
相似文献
引证文献
引用本文
王勇,孙平贺,赵仁明,等.大宝山钼矿复杂地层钻探技术[J].钻探工程,2012,39(11):22-25.WANG Yong, SUN Ping-he, ZHAO Ren-ming, et al. Drilling Technology in Complex Stratum of Dabaoshan Molybdenum Mine[J]. Drilling Engineering, 2012,39(11):22-25.