According to the difficulties of wire-line coring drilling in complex formation of Dawanggou molybdenum mine with intense alteration, uneven hardness and gushing leakage, the wall protection was adopted by casing first and slurry secondly. The discussion was made on the selection of drilling equipments and tools as well as diamond bit parameters determination; wall protection with K + humate-containing drilling mud and plugging with inert stuffing were put forward and tripping pressure surge and suction damage to the hole wall decreasing measures were used with good application effects.
参考文献
相似文献
引证文献
引用本文
王江平.嵩县大王沟钼矿区破碎地层金刚石绳索取心钻进实践[J].钻探工程,2012,39(10):40-42.WANG Jiang-ping. Practice of Diamond Wire-line Coring Drilling in Broken Formation of Dawanggou Molybdenum Mining Area in Song County[J]. Drilling Engineering, 2012,39(10):40-42.