高压旋喷桩加固预应力管桩桩端湿陷性土持力层施工技术 |
投稿时间:2012-06-01 修订日期:2012-09-07 点此下载全文 |
引用本文:徐建忠,诸葛艺,程海义.高压旋喷桩加固预应力管桩桩端湿陷性土持力层施工技术[J].钻探工程,2012,39(11):65-68.XU Jiang-zhong,ZHU GE-Yi,CHENG Hai-yi. Construction Technology of Consolidation for Collapsible Soil at Pipe End of Pre-stressed Pipe Pile by High-pressure Rotary Jet Pile[J]. Drilling Engineering, 2012,39(11):65-68. |
摘要点击次数: 1108 |
全文下载次数: 793 |
|
|
中文摘要:通过工程实例介绍了采用高压旋喷桩处理静压预应力管桩桩端湿陷性土层持力层的施工技术。由于原工程地质勘察报告没有提供桩端湿陷性土层的有关资料,在大量静压预应力管桩成桩且经静荷载检测均满足设计要求后,随着成桩时间的延长,成桩桩头发生自行下沉,在对桩作静载复测,确证此时桩的承载力不再满足设计要求,因而发现桩端持力层为湿陷性土层,并经复勘验证。这时对桩端湿陷性土层的加固施工存在诸多限制,这种特殊条件下,采取了针对性的施工操作、工艺流程、技术参数及措施。 |
中文关键词:工程基桩 预应力管桩 湿陷性土 高压旋喷桩 持力层加固 |
|
Construction Technology of Consolidation for Collapsible Soil at Pipe End of Pre-stressed Pipe Pile by High-pressure Rotary Jet Pile |
|
|
Abstract:The paper introduced the construction technology of consolidation for collapsible soil at pipe end of pre-stressed pipe pile by high-pressure rotary jet pile with an engineering case. When the subsidence of the pile end of pre-stressed pipe pile occurred in bearing stratum of collapsible soil with many restricted conditions for consolidation, the pertinent construction operations, technical processes, technical parameters and the countermeasures were adopted. |
keywords:engineering foundation pile pre-stressed pipe pile collapsible soil high pressure rotary jet pile bearing stratum consolidation |
查看全文 查看/发表评论 下载PDF阅读器 |