超深地下连续墙施工中几个问题的探讨
DOI:
作者:
作者单位:

武汉地质勘察基础工程有限公司,湖北地矿建设工程承包集团有限公司

作者简介:

通讯作者:

中图分类号:

TU476 .3

基金项目:


Discussion of Several Problems in Ultra-deep Underground Continuous Wall Construction
Author:
Affiliation:

Wuhan Geological Prospecting & Foundation Engineering Co., Ltd.,Hubei Geology & Mineral Resources Construction Engineering Group Co., Ltd.

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合武汉某地下连续墙工程,探讨了超深嵌岩地下连续墙施工过程中出现的因三轴搅拌桩施工造成成槽困难的问题,以及超深地下连续墙接头管安装和起拔问题,并提出了相应的解决措施。实践证明,这些措施是有效的,可以为武汉地区的类似工程提供参考。

    Abstract:

    Based on an underground continuous wall construction project in Wuhan, this paper discusses difficulties caused by three-axis mixing pile construction in the ultra-deep rock-socketed underground continuous wall and in the joint pipe installation and drawing with corresponding solution measures. The practice proves that these measures are effective and can be reference for similar engineering in wuhan.

    参考文献
    相似文献
    引证文献
引用本文

马勤,王芳.超深地下连续墙施工中几个问题的探讨[J].钻探工程,2013,40(11):68-71.
MA Qin, WANG Fang. Discussion of Several Problems in Ultra-deep Underground Continuous Wall Construction[J]. Drilling Engineering, 2013,40(11):68-71.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2013-05-19
  • 最后修改日期:2013-05-19
  • 录用日期:2013-10-09
  • 在线发布日期: 2013-11-29
  • 出版日期: