The formation characteristics of Longdong coalfield region are described, and based on the analysis on the main factors influencing the drilling construction, the drill bit diameter increasing, the borehole structure optimizing, the suitable drill bit for rock optimally selecting, mud system improving and other supporting technologies were adopted. The paper focuses on the prevention and treatment of the adhesive sticking drill accident.
参考文献
相似文献
引证文献
引用本文
潘小志.陇东煤田绳索取心钻探的探索和应用[J].钻探工程,2013,40(11):28-31.PAN Xiao-zhi. Exploration and Application of Wire-line Core Drilling in Longdong Coalfield[J]. Drilling Engineering, 2013,40(11):28-31.