陈台沟铁矿复杂地层深孔钻探施工技术
投稿时间:2014-02-24  修订日期:2014-07-01  点此下载全文
引用本文:刘锡金.陈台沟铁矿复杂地层深孔钻探施工技术[J].钻探工程,2014,41(10):41-44.
LIU Xi-jin. Construction Technology for Deep Hole Drilling in Complex Formation of Chentaigou Iron Mine[J]. Drilling Engineering, 2014,41(10):41-44.
摘要点击次数: 871
全文下载次数: 680
作者单位E-mail
刘锡金* 辽宁省冶金地质勘查局402队 liuxijin1@sina.com 
中文摘要:简述了陈台沟铁矿区地层的岩性及结构构造情况,总结了该矿区钻探施工所遇到的坍塌、掉块、漏水、涌水、缩径等不良地质现象所带来的施工问题,厚大千枚岩强烈造斜地层造成钻孔弯曲问题,深层钻进遇“打滑”地层等3大难题,提出了解决此3大问题的措施方法,取得了良好的效果。
中文关键词:复杂地层  深孔钻探  陈台沟铁矿
 
Construction Technology for Deep Hole Drilling in Complex Formation of Chentaigou Iron Mine
Abstract:The paper briefly introduces the lithology and structure construction in Chentaigou iron mine, induces 3 aspects of difficultis of collapse, block falling, water leakage, water inflow and diameter shrinkage affected by bad geological conditions; hole bending caused by strongly deflecting formation of thick phyllite and slipping formation encountered in deep drilling. The measures and methods are put forward to these 3 problems with good effects.
keywords:complex formation  deep hole drilling  Chentaigou iron mine
查看全文  查看/发表评论  下载PDF阅读器