陈台沟铁矿复杂地层深孔钻探施工技术
DOI:
作者:
作者单位:

辽宁省冶金地质勘查局402队

作者简介:

通讯作者:

中图分类号:

基金项目:


Construction Technology for Deep Hole Drilling in Complex Formation of Chentaigou Iron Mine
Author:
Affiliation:

The 402 Team, Metallurgical Bureau of Geology & Exploration, Liaoning Province

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    简述了陈台沟铁矿区地层的岩性及结构构造情况,总结了该矿区钻探施工所遇到的坍塌、掉块、漏水、涌水、缩径等不良地质现象所带来的施工问题,厚大千枚岩强烈造斜地层造成钻孔弯曲问题,深层钻进遇“打滑”地层等3大难题,提出了解决此3大问题的措施方法,取得了良好的效果。

    Abstract:

    The paper briefly introduces the lithology and structure construction in Chentaigou iron mine, induces 3 aspects of difficultis of collapse, block falling, water leakage, water inflow and diameter shrinkage affected by bad geological conditions; hole bending caused by strongly deflecting formation of thick phyllite and slipping formation encountered in deep drilling. The measures and methods are put forward to these 3 problems with good effects.

    参考文献
    相似文献
    引证文献
引用本文

刘锡金.陈台沟铁矿复杂地层深孔钻探施工技术[J].钻探工程,2014,41(10):41-44.
LIU Xi-jin. Construction Technology for Deep Hole Drilling in Complex Formation of Chentaigou Iron Mine[J]. Drilling Engineering, 2014,41(10):41-44.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2014-02-24
  • 最后修改日期:2014-07-01
  • 录用日期:2014-07-23
  • 在线发布日期: 2014-11-13
  • 出版日期: