伊朗TALEGHAN水利枢纽厂房封闭帷幕灌浆施工
投稿时间:2014-04-08  修订日期:2014-04-08  点此下载全文
引用本文:邓树密.伊朗TALEGHAN水利枢纽厂房封闭帷幕灌浆施工[J].钻探工程,2014,41(8):66-69.
DENG Shu-mi. Closed Curtain Grouting Construction of Powerhouse of TALEGHAN Water Control Project in Iran[J]. Drilling Engineering, 2014,41(8):66-69.
摘要点击次数: 966
全文下载次数: 742
作者单位E-mail
邓树密* 中国水利水电第十工程局有限公司 153327343@qq.com 
中文摘要:伊朗TALEGHAN水利枢纽工程发电厂房位于库区左岸山体内,需要承受80 m深水头高度的渗透压力,对地下厂房的防渗要求极高,施工技术难度大。根据这一特点有针对性地对弱透水岩层采用了湿磨水泥进行灌注,取得了较好的灌浆效果。重点介绍了地下厂房四周封闭帷幕灌浆的施工方法,为类似工程的防渗灌浆施工提供了可借鉴的经验。
中文关键词:伊朗  TALEGHAN水利枢纽  地下厂房  防渗帷幕  湿磨水泥
 
Closed Curtain Grouting Construction of Powerhouse of TALEGHAN Water Control Project in Iran
Abstract:Powerhouse of TALEGHAN water control project of Iran is located in the mountains on the left bank of reservoir area. With high seepage pressure of 80m water head height, the construction was difficult because of extremely high requirements for seepage control on underground powerhouse. On this basis, targeted wet grinding cement grouting was applied in weak permeable layer with good effects. The paper mainly introduces the construction method of enclosed curtain grouting for underground powerhouse, which can be reference to the similar projects.
keywords:Iran  TALEGHAN water control project  underground powerhouse  impervious curtain  wet grinding cement