高放废液处置场选址勘察特大构造破碎带的钻进工艺 |
投稿时间:2014-06-06 修订日期:2014-12-05 点此下载全文 |
引用本文:员建峰,洪波,宫玉奎,等.高放废液处置场选址勘察特大构造破碎带的钻进工艺[J].钻探工程,2015,42(2):41-44.YUAN Jian-feng,HONG Bo,GONG Yu-kui,et al. Drilling Technology for Location Investigation of Deposit Site of High-radioactive Waste Fluid in Tectonic Fracture Zone[J]. Drilling Engineering, 2015,42(2):41-44. |
摘要点击次数: 1145 |
全文下载次数: 771 |
|
|
中文摘要:高放废液处置的特殊性决定了它对选址勘察中钻探施工有极其严苛的要求。在钻探工艺方面受到了多方面的限制,对钻探施工影响极大,尤其是遇到特大构造破碎带、地层极为复杂的情况下,对钻探是极大的考验。在甘肃北山BS02号孔施工中,通过采用多种不同技术措施,钻穿了十月井特大构造破碎带和复杂地层,满足了设计要求,保证了工程质量和水文地质试验效果。 |
中文关键词:高放废液处置场 勘察 钻探 构造破碎带 复杂地层 坍塌掉块 |
|
Drilling Technology for Location Investigation of Deposit Site of High-radioactive Waste Fluid in Tectonic Fracture Zone |
|
|
Abstract:The particularity of high-radioactive waste fluid deposit determines the very strict requirements on the drilling construction for the location investigation of deposit site, especially in the exceptional large scaled tectonic crushed zone and complicated geological conditions. During the drilling operation of BS02 in Beishan of Gansu, many different technical measures were used, the large tectonic crushed zone and complicated formation were drilled through for Shiyuejing construction to meet the design requirements and ensure the engineering quality and hydrogeological test effect. |
keywords:deposit site of high-radioactive waste fluid investigation drilling tectonic crushed zone complicated strata collapse and block falling |
查看全文 查看/发表评论 下载PDF阅读器 |