涪陵页岩气田生产套管防漏堵漏技术对策与实践
DOI:
作者:
作者单位:

中石化重庆涪陵页岩气勘探开发有限公司,长江大学非常规油气湖北省协同创新中心,中石化重庆涪陵页岩气勘探开发有限公司,中石化重庆涪陵页岩气勘探开发有限公司,中石化重庆涪陵页岩气勘探开发有限公司

作者简介:

通讯作者:

中图分类号:

P634.8;TE28

基金项目:


Technical Countermeasures and Practice of Leakage Proof and Plugging by Production Casing in Fuling Shale Gas Field
Author:
Affiliation:

The Exploration and Production of Shale Gas Chongqing Fuling, SINOPEC,Yangtze University Hubei Cooperative Innovation Center of Unconventional Oil and Gas,The Exploration and Production of Shale Gas Chongqing Fuling, SINOPEC,The Exploration and Production of Shale Gas Chongqing Fuling, SINOPEC,The Exploration and Production of Shale Gas Chongqing Fuling, SINOPEC

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    页岩气生产井投产前,都要进行大规模分段压裂,生产套管必须能承受不低于90 MPa的施工压力。2013年涪陵工区试验井组相继出现2口井稳不住压现象,导致长水平段分段压裂的储层改造工艺受限,该问题一时成为制约涪陵页岩气田钻井生产和质量的一大“瓶颈”。为此,从生产套管设计、施工、治理3个方面进行了防漏堵漏技术措施研究,并取得一些进展,较好地满足了页岩气高效开发的需要。本文介绍了涪陵页岩气一期产建套管防漏堵漏对策与实践成果,为国内类似页岩气区块的开发提供借鉴和参考。

    Abstract:

    Before the operation of shale gas production well, large-scale should be carried out, the production casing must be able to bear the construction pressure of ≥90MPa. In 2013, unsteady pressure happened in 2 wells of testing well group in Fuling working area, which resulted in the subsection fracturing technology being confined in long horizontal for reservoir reconstruction, this problem sometimes became the bottleneck that resticted Fuling shale gas drilling production and quality. Therefore, the technical measures of leakage proof and plugging were studied in production casing design, construction and treatment with some progress to meet the requirement of efficient shale gas development. This paper introduces the countermeasures and practice achievements in leakage proof and plugging of casing in the first phase of Fuling shale gas, whi

    参考文献
    相似文献
    引证文献
引用本文

赵明琨,舒曼,李永成,等.涪陵页岩气田生产套管防漏堵漏技术对策与实践[J].钻探工程,2016,43(7):37-41.
ZHAO Ming-kun, SHU Man, LI Yong-cheng, et al. Technical Countermeasures and Practice of Leakage Proof and Plugging by Production Casing in Fuling Shale Gas Field[J]. Drilling Engineering, 2016,43(7):37-41.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-05-27
  • 最后修改日期:2016-05-27
  • 录用日期:2016-06-01
  • 在线发布日期: 2016-07-19
  • 出版日期: