北京东坝中路红松园基坑支护施工组织方案
投稿时间:2018-02-22  修订日期:2018-02-22  点此下载全文
引用本文:何司忠.北京东坝中路红松园基坑支护施工组织方案[J].钻探工程,2018,45(4):54-59.
HE Si-zhong. Design and Construction Scheme of a Foundation Pit Project in Beijing[J]. Drilling Engineering, 2018,45(4):54-59.
摘要点击次数: 1125
全文下载次数: 641
作者单位E-mail
何司忠* 北京中兵岩土工程有限公司 h.szh@163.com 
中文摘要:北京东坝中路红松园工程由多种建筑形式组成,根据其周边环境及岩土工程条件、地下水情况,基坑支护设计方案分5个区域采用4种不同的支护形式,2个区域采用土钉墙+预应力锚杆护坡桩方案,另外3个区域分别采用预应力锚杆护坡桩方案、挡土墙+预应力锚杆护坡桩方案、锚杆复合土钉墙方案。本文还介绍了基坑降水及抗浮设计情况以及基坑支护施工技术方案。
中文关键词:基坑工程  土钉墙  挡土墙  预应力锚杆  护坡桩
 
Design and Construction Scheme of a Foundation Pit Project in Beijing
Abstract:The paper introduces a foundation pit project in Beijing, which consists of a variety of architectural forms, according to the surrounding environment and geotechnical conditions, as well as groundwater conditions, the foundation pit support scheme contains 4 different supporting methods for the divided 5 regions, soil nailed wall + pre-stressed anchor bolt retaining pile structure is adopted in 2 regions and pre-stressed anchor bolt retaining pile, retaining wall + pre-stressed anchor bolt retaining pile and anchor bolt composite soil nailing wall are applied in 3 other regions separately. This paper also introduces the designs of foundation pit dewatering and anti-floating, as well as the technical scheme of foundation pit support construction.
keywords:foundation pit project  soil nailed wall  retaining wall  pre-stressed anchor bolt  retaining pile